Mob: 07401 331482 or 07894 670237 
 
DKM Consultants have built a reputation of integrity with our clients 
Your Dream home can be designed and built for far 
less than moving. 
No need to move. Add more rooms with a Loft Conversion, the most economical space to develop. 
 
 
Did you know?  
We can advise on planning solutions, even before you own the keys to your home.  
 
Whether it' small  
or large scale domestic, DKM Consultants can help take your  
idea to plans. 
 

Building Control Applications in Kent 

Any structural work you under take on your property will require a sign off by building control. If this is a removal of a wall or dreation of an opening or a small extension this can be done on a Building Notice with limited drawings abut will require a specification and scope of works listed. If there is a third party interface such as shared party wall, public sewer or a 2 storey extension then this must be done on a full plans application which means a full drawing of the works must be submitted which would show all the sections and where permissions are to be sort form the third parties. 
 
Normally a knock through with removal of 1 or 2 load bearing walls or a small extension or loft conversion would normally be done with a building notice if using a qualified builder doing the full scope of the works. If you are breaking down the contract into trades or building more than this it is advised to submit the full plans application 
 
Once you have planning granted for your extension, loft conversion or Out Building then you be required to submit an application to Building Control before the works start. These documents will consits of the followiing:- 
Detailed drawings and sections 
Specification for materials 
Calculations 
Building Control application forms 
Copy of the land registry document supplied at planning 
 
On a new building application the level of information is greater and you will need to provide more a detailed level of application, offen required to meet a higher level of code. This is expecially so in Conscervation areas or areas of Natural Beauty when there planning can insist on a code 3 , 4 or even 5 building. The additional information required is as follows:- 
SAP Reports 
ECP Reports 
DER Reports 
(these are out sourced to someone who we work closely with) 
 
If you have not had your planning drawings done through DKM Consultants, dont worrry we can still do them for you. Often is the case that Architects will out source this element of the work and this in post cases costs the client more money. DKM Consultants do planning and building control applications so no need to shop around. 
 
DKM Partners with LABC - Local Authority Building Control 
 
DKM Consultants work along side structural experts. We use a local steel supplier in Medway for your structural elements and Architectural railings and gates aswell as partnering with qualified building companies who specialise in different sized projects and these can be found under services provided
structural steel goal post Gravesend
loft conversion Bromley with cranked steels
 
 
 
Designed and created by it'seeze
Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings